Monday, June 28, 2010

1 step forward, 1 step back

We went down to see the house on the weekend.

Got a quote for concreting... Going to organise another one or two for later this week.

Also went searching for blinds... We are thinking that we may go for:
* Timber venetians with sheer eyelets over the top for the minor bedrooms
* Curtains for the main bedroom (or venetians with sheers)
* Panel glides for the sliding doors
* Possibly Romans in the living areas with some sort of sheer curtain/blind underneath

In the mean time we have brought a whole heap of redishades!

Not sure how some of this looks in real life... But it looks good in my head! :-/ Any pictures (especially of venetians with sheers) would be greatly appreciated!


Then we finally decided to look at the house. It was muddy outside and we were reluctant to get dirty! We could only see two things which had been completed from the inspection on 10th June. Firstly one of the outdoor powerpoints was moved (it was previously under a tap). Secondly, the splashback was installed... Would have been fantastic if it wasn't installed WRONG! It is about 200mm too short ::angry:: ::angry:: ::angry::

On the upside I do like the colour!
Image

It really seems as though no one is reading the plans!

When we spoke to the Construction Manager today he said that we should have our final inspection in 2 weeks and handover in 3... Don't know whether to get excited or not...

Sunday, June 20, 2010

After the initial walkthrough...

Last Thursday we had our initial PCI. Our SS is busy at the moment, so the Construction Manager ended up taking his place...

When we arrived we knew there was a lot of work still to be completed (major re-bricking etc), so we didn't feel we were in the position to sign the PCI document. Luckily the CM was fine with us doing another walk through at a later date and signing it then...

We received the results of the mortar test which was completed. Mortar FAILED due to NO lime!
Apparently the fix is to use an Alkaline spray treatment (http://www.mortarmend.com.au). However, there is a small note on this website saying that it bonds "with free Lime in the Cement or Lime components of the mortar". Not sure about this so we are doing some of our own research. The only other options are
* full render (which we do not want)
* grinding out all of the mortar and repointing (which could be very messy)...


Defect list had almost 100 items on it.. Some of the items which I can remember are:
* Rebricking 4 sections of the house (maybe 1/4 overall) due to bowed walls and poor quality brickwork.
* Fix mortar around entire house (see above)
* Install splashback
* Paint front door
* Paint render
* Find a fix to the "expansion joint" which is installed on the flooring. It sticks up about 5mm and is a massive trip hazard in the middle of the hallway! (see picture below)
* Many paint touchups, including cracked cornices (will end up repainting about half the house I would think)
* Fix a few tiles
* Replace some glass in the windows due to scratching and glass defects
* Repair plaster around the downlights
* Repair nails which have popped out of the plaster
* Fix sharp areas in carpet (where nails are sticking up)
* Replace section of garage door which is dented
* Seal around baths/sinks/shower screens


Hopefully we can still have handover in 4 weeks or so. It's been a long wait (site start 11th Nov last year)... The number of defects which we have picked up along the way has been disappointing. We are grateful that Carlisle has been easy to deal with in regards to fixing them so far. For us, it is more about how problems are dealt with, rather than if they occur in the first place...

Now for some pics! Most were taken after it was dark outside... Some with flash and some without so just ignore the different lighting!


Front Door, Feature Hobs and Entrance





Expansion joint...


Minor Bedroom


Bathroom


Powder Room



Master Bedroom


Ensuite




Home Theatre Room



Laundry



Lounge/Dining/Kitchen